ELD works by creating an electrical field between the membrane surface and a conductive deck or substrate [ie Concrete] which is earthed to the building. D) Requires temporary Tensile Strength Testing dams to be installed to partition off individual wet areas from non-wet areas in buildings, Vector Mapping, sponge and other methods are able to
